|
1 |
Public Consultation for the Proposed Revised Guidelines for Pollution Control Officer (PCO) Accreditation and IRR of the Wastewater Charge System (WWCS) and Discharge Permits Under RA 9275
|
|
2 |
Philippine Energy Efficiency Project
|
|
3 |
Third Party Environmental Audit for the Manila Third Sewerage Project (MTSP)
|
|
4 |
Optimization of Operation of Nestlé Pulilan's Wastewater Treatment Plant
|
|
5 |
Revision of Guidelines for PCO Accreditation and Compliance Inspection Manual
|
|
6 |
Finalization and Harmonization of Discharge Permitting and Wastewater Charge System
|
|
7 |
Quality Management System (ISO 9001:2008) for Sual and Pagbilao Power Stations
|
|
8 |
Operationalization of the Water Quality Management Funds
|
|
9 |
Manufacturing Productivity Extension (MPEX) Program
|
|
10 |
Development of Industry-Specific Effluent Standards
|
|
11 |
Integrated Management System (OHSAS 18001:2007 and ISO 14001:2004) for Sual and Pagbilao Power Stations
|
|
12 |
Market Study on the Proposed Mercury Recycling Facility
|
|
13 |
Workshop on Establishing Integrated Management System (IMS)
|
|
14 |
Workshop on Hazard Identification, Risk Assessment, and Determining Controls (HIRADC)
|
|
15 |
Energy Supply and Demand Survey
|
|
16 |
Finalization of the Revised Water Quality Guidelines and Development of Effluent Standards
|
|
17 |
Integrated Management System (IMS) Assistance
|
|
18 |
Hazard Identification, Risk Assessment and Control (HIRAC)
|
|
19 |
Integrated Management System (IMS) Gap Analysis
|
|
20 |
Development of an Online Hazardous Waste Tracking System (HWTS)
|
|
21 |
Policy Study on Lamp Waste Management
|
|
22 |
Regional and National Water Quality Status Reports For Public Information and Advocacy
|
|
23 |
Environmental Compliance Audit
|
|
24 |
Development and Maintenance of an Online Polychlorinated Biphenyls (PCB) Database
|
|
25 |
Emergency Preparedness and Response (EPR) Trainings
|
|
26 |
EMS/ISO 14001 Assistance
|
|
27 |
Final Layout and QA/QC of Guidebooks for DBP’s Environmental Infrastructure Support Credit Program (EISCP)
|
|
28 |
Market Opportunity and Techno-Economic Assessment of Bioethanol as Fuel Additive
|
|
29 |
Assessment of the Competitiveness of Philippine Natural Products
|
|
30 |
Promotion of Cleaner Production – Environmental Technology Verification (ETV)/Environmental Technology Evaluation (ETE)
|
|
31 |
Product Road Mapping Locally Developed PC-based Access Point Deployment Kit
|
|
32 |
Preparation of Technology Commercialization Plan (TCP) for the Natural Dyeing Common Service Facility (CSF) in Aklan
|
|
33 |
Preparation of Technology Commercialization Plan (TCP) for the Localization of Compressed Natural Gas Vehicle (CNGV) Conversion Components
|
|
34 |
Preparation of Technology Commercialization Plan (TCP) for Cashew Nut Shell Liquid (CNSL)-based Products
|
|
35 |
Natural Gas Energy Demand Survey
|
|
36 |
Initial Environmental Examination (IEE) Report for the Tree Top Mangrove Area Project
|
|
37 |
Conduct of Hazard and Operability (HAZOP) Study / Risk Assessment for the proposed "Al-Baraha Sewage Treatment Works (STW) Tankered Sewage Reception Facility" in Qatar
|
|
38 |
Study on National Waste Generation and the Waste Management Industry for Geocycle Philippines
|
|
39 |
Development of "Medium-Sized Projects" for Persistent Organic Pollutants (POPs) Management and Elimination in the Philippines
|
|
40 |
Human Resources Assessment Survey for the 6th Country Programme Sites in Luzon and Visayas
|
|
41 |
Occupational Health and Safety Compliance Audit (OHSCA)
|
|
42 |
Audit Training Workshop on ISO 14001:2004 and OHSAS 18001:2007
|
|
43 |
Training on Hazard Identification, Risk Assessment, and Determining Controls (HIRADC)
|
|
44 |
Audit Assistance/Training for Nestle CARE
|
|
45 |
Review and Amendment of DAO 2003-26 (Revised Industrial Ecowatch System) and DAO 2003-27 (Preparation and Submission of Self-Monitoring Reports)
|
|
46 |
Hazards and Operability (HAZOP) Training
|
|
47 |
IMS Orientation and Trainings on Chemical Handling, Solid Waste Management, and Hazardous Waste Management
|
|
48 |
Development of Soil Quality Guidelines
|
|
49 |
Policy Review of the Philippines' Effluent Management Strategy
|
|
50 |
Training on Enhanced Participatory Area Planning (PAP)
|
|
51 |
Phase II Study for the Preparation of the Implementing Rules and Regulations (IRR) of the Clean Water Act (CWA)
|
|
52 |
Renewable Energy Policy and Market Development Studies
|
|
53 |
Environmental Performance Monitoring (EPM)
|
|
54 |
Review of Policies and Rules on Regulations on Hazardous Waste Management
|
|
55 |
Site Remediation Activities and Soil Cleanup as a component of the Project Preparation Grant (PPG) for the Philippine Integrated Persistent Organic Pollutants (POPs) Management Project
|
|
56 |
National Action Plan on Mercury and Mercury-containing Wastes
|
|
57 |
Gap Analysis and Review on Integration of Safety, Health, and Environmental (SHE) Requirements in the Transfer of Nestlé Ice Cream and Chilled Dairy Production to Pulilan, Bulacan
|
|
58 |
Formulation of the Integrated Water Quality Management Framework (IWQMF)
|
|
59 |
Water Quality Management Implementation Enhancement of Proposed Water Quality Management Fund (WQMF) Guidelines
|
|
60 |
Ash Pond Leachate Quality Monitoring
|
|
61 |
Preparation of Environmental Management Guidebooks for the Sustainable Logistics Development Program (SLDP)
|
|
62 |
Feasibility Study for the Commercialization of Coco Methyl Ester (CME) as Fuel Additive
|